The Resort Municipality of Whistler (RMOW) is requesting quotations to complete civil works on Baxter’s Creek
adjacent to Valley Trail. The scope of work shall include the following:
- Excavate and expose sanitary main to a minimum 600mm below pipe.
- Install Geotextile and 300mm thick base pad of 100mm Pit Run.
- Install Approx. +/- 5 Cu.m. concrete encasement as shown in Pipe Encasement Detail including inset cobbles.
- Backfill remaining trench with Approx. +/- 20 Cu.m. graded 400-600mm Boulders, 100-175mm Cobbles and
Sand. - Contractor to remove and replace riprap sidewalls required to permit construction on sanitary main.