Installation of packaged sanitary pump station and associated electrical work including an electrical kiosk, conduit connections, and a connection to a BC Hydro pad mounted transformer (to be completed by BC Hydro).
Additionally, the scope of work includes connection of a gravity sewer from the Rainbow Park washroom to the pump station, connection of a section of pipe from the pump station to the existing force main, tie in of the existing force main to the existing Alta Lake Road manhole, re-benching of the existing manhole and excavation and/or drilling and blasting of rock to complete excavation and trench work.