The Contract is generally for the following work: Removal and
disposal of damaged concrete on bridge deck and ballast wall. Topside
concrete repairs for bridge deck and ballast wall. Installation of new deck
joint sealant on the west end. Local concrete repairs to damaged
concrete on barrier walls. (Provisional) Local full depth bridge deck
concrete repairs, if required.
Direct all inquiries regarding the Contract in writing, to
Ash Laing P.Eng., Project Administrator
Klohn Crippen Berger Ltd.
500 – 2955 Virtual Way,
Vancouver, BC V5M 4X6
Email: ALaing@klohn.com