On shared unceded L̓il̓wat7úl and Sḵwx̱wú7mesh territory

The Resort Municipality of Whistler (RMOW) invites proposals from qualified contractors with relevant expertise and experience that will offer the best overall proposed method and value of work related to Cure in Place Pipe (CIPP) Lining and Pre-Lining Grouting repairs and rehabilitation of a 200mm gravity sewer main.

It is the RMOW’s goal to ensure Whistler’s sewer systems meet all applicable standards and are maintained in a manner that is cost-effective, ensures reliability and minimizes or eliminates
environmental impacts.

The Contract is generally for the following work:

  • Styrene-free CIPP lining of a 200mmØ 68m long ductile iron (DI) sanitary sewer main from manhole to
    manhole including but not limited to:
    o Required bypass and cleaning
    o Pre-lining grout repair of the main in two (2) HVV Grade 5 locations
    o Reinstatement of three (3) service connections post lining

A mandatory site visit will be held on December 3, 2026 at 1:00 p.m. PST at 3315 Lakeside Road,
Whistler, BC.