On shared unceded L̓il̓wat7úl and Sḵwx̱wú7mesh territory

The RMOW, Contractor to carry out the removal and install of a new set of exterior stairs to the existing building the exit stair to meet BCBC and to be covered to reduce snow management / maintenance.

Please note that there is a non-compulsory site meeting on Friday, March 28, 2025 at 2 p.m., meeting at the car park entrance at 5678 Alta Lake Road.