Construction works to rehabilitate the Millar’s Pond Sanitary Pump Station (S121) located at 2773 Cheakamus Way. Works will include but are not limited to:
• Removal and replacement of internal piping, pumps, equipment, and instrumentation in the existing wet well
• Coordination with Barski to modify the wet well for new pump bases
• Supply and installation of upstream and downstream permanent bypass manholes
• Removal and replacement of the existing electrical kiosk and concrete slab
• Replacement of the BC Hydro service
• Removal and replacement of a potable water sampling station
• Site grading and restoration
• SCADA implementation and commissioning