Soil Removal and Deposit Permit

Construction

Removal and Deposit of Soil Permit

The RMOW regulates the removal and deposit of soil from lands within Whistler by enforcement of the Soil Removal and Deposit Bylaw No. 1332, 1998. A soil removal/deposit permit is required if the volume of soil being removed or deposited exceeds 200 cubic metres. This can be applied for with the Soil Removal or Deposit Form.Â