On shared unceded L̓il̓wat7úl and Sḵwx̱wú7mesh territory

Mom and child playing in the sand at Lost Lake in Whistler, British Columbia

Here is the weekly update on projects and things of note that may impact your day-to-day life, including events, getting around town, parks, construction, etc. 

FACILITIES AND RECREATION 

Meadow Park Sports Centre pool area closed August 17 to September 27; leisure pool already closed

The leisure pool is closed at Meadow Park Sports Centre for maintenance. The leisure pool needs a heat exchanger part replaced. Heat exchangers are essential for pool energy efficiency and cost savings.  

The lap pool, hot tub, sauna and steam room are all open until Sunday, August 16. 

The entire pool area, including the lap pool, leisure pool and hot spots are closed for the annual maintenance shutdown from Monday, August 17 to Sunday, September 27. For efficiency, we will also be installing the new window, door, and curtain wall installation as part of the centre’s envelope upgrades. We look forward to reopening our pool area fully on Monday, September 28. 

Resident recreation registration started August 8 

Registration for Whistler residents and non-residents is now underway. Visit our recreation program page for information. 

Park food trucks, free bike valet and free parks shuttles 

For peak season, until September 7, Lost Lake Park and Rainbow Park have food trucks daily from 11 a.m. to 5 p.m. Lakeside Park, Alpha Lake Park and Whistler Olympic Plaza have food trucks on specific dates and for some events. Find the full schedule and vendors.

Lost Lake Park and Rainbow Park have free bike valets from 12 to 6 p.m. on weekends and statutory holidays. Our free bike valet is at Whistler Olympic Plaza from 11 a.m. to 6 p.m. on Fridays, Saturdays, Sundays, and statutory holidays and at summer events from 6 to 10 p.m. 

Take a free summer parks shuttles to Lost Lake Park, Rainbow Park, and the new Parks Loop including Lakeside Park, Wayside Park and Alpha Lake Park. 

Parks updates: refurbishing Meadow Park field, a fast ball diamond at Myrtle Philip School, repairs to Spruce Grove ball diamond 

Now Meadow Park has water, our Landscape Team are doing a lot of work to refurbish the old baseball diamonds by removing ball diamond material, preparing the ground and seeding the field. We will irrigate the Meadow Park field at 12 p.m. each day. The old ball diamond material will be moved to Myrtle Philip Community School, so the lower field can be converted from a soft ball diamond to a fast ball diamond.  

Meanwhile at the Spruce Grove Park ball diamond, the Landscape Team repaired an irrigation break that happened at the weekend, and will be prepping and repairing the first base dugout.   

In addition to these projects, the Landscape Team is busy with their usual maintenance: weeding, pruning, mowing, inspecting irrigation, cleaning washrooms and removing garbage.  

Lost Lake Connector Trail and Beachcut Trail closed for migrating toads 

The 2026 Great Toad Migration has started at Lost Lake Park. Western Toads have started to emerge from the lake. Beachcut Trail is closed for their migration and the area has detour signs. Interested in volunteering to help the toads? Email stewardship@whistler.ca. 

River of Golden Dreams is closed from the new fish weir to CN railway portage due to low water 

The River of Golden Dreams has low water. To protect the developing fish embryo in the fish habitat, we have closed the section from the new fish weir (close to Alta Lake) to the CN rail portage. You can canoe or SUP from the bottom of Lorimer Road, or take out at the new weir and follow the 600-metre portage trail to below the CN rail tracks.  

40 Books for 40 Years  

Forty years ago, on August 27, 1986, Whistler Public Library opened its doors for the first time. The library team invites you to celebrate the 40th birthday with a reading challenge: 40 Books for 40 Years. Your challenge is to read 40 books this year – any genre, fiction or non-fiction, and physical books, e-books, and audiobooks are welcome. This challenge is designed to spark curiosity, encourage trying new genres, and reconnect with reading. Learn more. 

Rainbow Lake trail closed 

The Rainbow Lake hiking trail is closed until late September while the Gin and Tonic bridge and A-Frame bridge are replaced. The Rainbow Falls Loop and Flank Trail will stay open, but there’s no access above the Flank Trail.  

NOTIFICATIONS 

Water main flushing in Benchlands, Nicklaus North, Nesters, Spruce Grove and White Gold 

We are flushing water main pipes for the next few weeks. This improves water quality and maintains the water system.  

During flushing, you may have temporary water discolouration. You may also notice lower water pressure and more water flowing in the street and ditches. If your water is discoloured, run the cold tap for 15 to 30 minutes until your water runs clear. Avoid doing laundry until the water is clear again. Contact us at 604-935-8190 or email engineers@whistler.ca if your water continues to be discoloured.  

Campfire ban 

Campfires are banned in Whistler. All campfire permits are suspended during the ban. CSA- and ULA-rated propane campfire apparatus are permitted when used in a way that complies with regulations.  

To report a wildfire, please call 911 or 1-800-663-5555 or dial *5555 on your cell phone. 

Whistler is in Water Conservation Stage 2 

In-ground automatic irrigation systems can water three days a week between the hours of 10 p.m. and 4 a.m., with the days determined by your address.   

Edible gardens can be watered by any irrigation method any day of the week between 7 and 10 a.m., as well as 8 to 11 p.m. Trees, shrubs and flower beds can be watered manually or by hand any day of the week between 7 and 10 a.m. as well as 8 to 11 p.m.  

It’s essential to conserve water both for drinking and to fight structural fires. This year we have a very low snowpack that could lead to summer drought.  

Apply for a Temporary Irrigation Permit if you have new landscaping that needs more frequent watering. Read more about water conservation restrictions. 

Get a head start with FireSmart – book your free assessment today

Reducing the risk of wildfire starts at home. Assessments are now open for booking for homeowners and stratas, and stratas can also coordinate property work days with the FireSmart team. Visit our website to book an assessment, plan a work day and view the chipper schedule. 

Yard waste disposal open at Nesters and Function depots 

You can drop off yard waste for free at the Nesters and Function depots until November.  

EVENTS

Summer Movies at Whistler Olympic Plaza: Free Solo August 19 

Watch Free Solo at Whistler Olympic Plaza on Wednesday, August 19 from 8 to 10 p.m.  

Galactic featuring Jelly Joseph perform August 20 

Galactic featuring Jelly Joseph perform at Whistler Olympic Plaza Thursday, August 20 from 6:30 to 9 p.m. DJ PRAiZ opens the performance.  

Trooper performs August 21 

Trooper performs Friday, August 21. DJ ShotSki opens. Join us at Whistler Olympic Plaza from 6:30 to 9 p.m.  

Summer Movies at Whistler Olympic Plaza: McFarland, USA on August 22 

Watch McFarland, USA at Whistler Olympic Plaza on Saturday, August 22 from 8 to 10 p.m. 

UTMB Whistler Race on the Village Stroll – August 22 

UTMB Whistler race participants will be on the Village Stroll on Saturday, August 22, from approximately 10:30 a.m. to 4:30 p.m. The route will pass through the stroll between the Excalibur Gondola area and Village Square before continuing toward Whistler Way. Approximately 200 to 275 athletes are expected throughout the day. Event marshals and course signage will be in place to help ensure safe movement through the area.

Municipal Election Candidate Information Session: August 26 

Thinking about running for Mayor, Council or School Board Trustee in the next municipal election on October 17, 2026? Join municipal staff for an information session at Whistler Public Library and online, Wednesday, August 26 from 5:30 to 7 p.m. 

GETTING AROUND  

Whistler Transit schedule

The Whistler Transit buses is on the spring, summer and fall schedule. Transit pass prices were recently reduced to make transit more affordable for locals. For bus times, visit the BC Transit website.   

WILDLIFE ALERTS

Reports of bears accessing food in Whistler parks

Food-conditioned black bears have recently been reported in Lost Lake and Rainbow parks, including incidents involving unattended backpacks. Help keep bears wild by securing food and scented items, disposing of waste properly, and using bear-proof bins. Learn more about staying bear smart. 

WILDFIRE FUEL MANAGEMENT 

Alta Lake Road north 

We are managing vegetation in partnership with the Cheakamus Community Forest to reduce wildfire risk along the north end of Alta Lake Road. Work continues in the unit 2 and unit 5 areas on the map.  

This work involves temporary trail closures on: Barts Dart Trail, River Runs Through It Access Trail, A River Runs Through It and Get Over It. Work also requires intermittent closures on the gravel pit access road down from Alta Lake Road, this doesn’t include the Emerald Forest section.  

Please respect all signs and staff for safety reasons because there will be machinery operating and tree falling. Trails will be restored following the work. View our website to learn more. 

CONSTRUCTION 

Blackcomb Way / Fitzsimmons Creek (Village) Bridge Deck Repairs August 24 to September 17 

Expect one-way traffic during construction. Please follow all traffic controls. 

Fitzsimmons Creek gravel removal project begins August 17

Work to support flood protection and creek maintenance will take place between Nancy Greene Drive and the Nick North Golf Course from August 17 to August 28, between 7 a.m. and 5 p.m. Construction vehicles will temporarily use the Valley Trail, Old Millroad Trail, and Nancy Greene Drive on rotating dates to access the creek. Expect traffic control, increased noise, and activity. Please use caution and follow posted signage or personnel direction.

Fitzsimmons Creek Restoration Work Begins August 17 

Work to stabilize the riverbank and improve fish habitat in Fitzsimmons Creek will take place from August 17 to 25 between White Gold Park and the Lost Lake Passive Haus. Residents on Fitzsimmons Road South and users of the Valley Trail can expect increased construction activity, please follow all signage. These improvements will help protect the creek bank from further erosion while enhancing fish habitat in Fitzsimmons Creek. 

Paving work at Eva Lake Road in Nordic Estates neighbourhood: from Whistler Road to Garibaldi Way  

 We are paving at Eva Lake Road in the Nordic Estates neighbourhood from Wednesday, August 19 to Friday, August 21, 7 a.m. to 8 p.m. Expect minor traffic delays, congestion and traffic control for turning in and out at Eva Lake Road. There will be single-lane alternating traffic on Eva Lake Road, which may result in minor traffic delays, congestion, and increased noise. Construction equipment will be present. 

Please follow all traffic controls. 

Traffic delays between Pemberton and Whistler due to Miller Capilano Highway Services work 

Miller Capilano Highway Services have informed us they will be working on the Soo River Bridge 22 kilometres north of Whistler from July 20 for approximately 40 days. Give yourself additional time for any journey between Pemberton and Whistler: there will be single-lane alternating traffic and temporary traffic signals for the entire project.   

Construction on Millars Pond sewer lift station replacement underway 

The Millars Pond sewer lift station replacement project is underway and will be completed in early October. The project is located at 2773 Cheakamus Way in the Bayshores neighborhood.  

Residents may experience increased traffic and noise in the area. Please follow all posted signage.  

Construction on the Spruce Grove Circle Water Valve and Fitting Replacement Program is scheduled for August 4 to 31 and Mons Road from September 1 to 11 

Construction on the Spruce Grove water valve and fitting replacement project is expected to take place in Spruce Grove Circle starting Tuesday, August 4 to Monday, August, 31 and on Mons Road from Tuesday, September 1 to Friday, September 11. Please watch for updates because the dates may change.  

Spruce Grove residents will be given 72 hours’ notice when the water will be temporarily shut off. Expect equipment noise, construction vehicles and minor vehicle and pedestrian delays during the work. Please follow directions from signs and traffic controllers.  

Water corrosion control system upgrades underway at Emerald UV Water Treatment Station 

The water corrosion control system upgrades at the Emerald Estates Water Treatment Station, on 9523 Emerald Drive, are underway. They are scheduled to be complete in November 2026. Once the new water treatment system is installed, we will notify residents before we start using the new system to improve water quality. 

 Please use caution if you are using trails in this area because there may be minor detours. Please follow all signage. 

Brio water services and valve replacement project 

The Brio water services and valve replacement project contractor has set up a temporary above-ground water supply to support construction. This temporary water supply is expected to be used until October 8. During this time, residents throughout the upper Panorama Ridge area may have a reduced water supply and water pressure. The map shows the area that will be impacted. 

Current schedule for reduced water supply and pressure:  

  • 3373-3431 and 3378-3390 Panorama Ridge, Alta Vista Works Yard at 3000 Highway 99 (see segment 1): June 29 to October 8 
  • 3341-3369 and 3350-3374 Panorama Ridge (see segment 2): August 12 to October 8 
  • 3317-3333 and 3314-3346 Panorama Ridge (see segment 3): September 18 to October 8 

Your water may have air and be discoloured when your water service is restored. Please run a top-floor tap until the water runs clear. 

Meadow Park rejuvenation work is underway 

Fully funded by the Province of B.C. through the Resort Municipality Initiative, this project will replace the Meadow Park playground, splash park and realign the Valley Trail. This project will also transition the ball fields into open greenspace with a fenced off-leash dog area. There will be varying closures within the parks and adjacent parking areas over the spring and summer while our crews complete this exciting project. Meadow Park playground and spray park close for construction until November 30. Discover our other great locations to play. 

RCMP renovation underway 

Please expect reduced parking at Municipal Hall, and increased construction activity, noise and traffic throughout this period. Construction is scheduled until October.